Epoxy

Dovchem is the Construction Chemical Product manufacture
Epoxy /PU Industrial Flooring Food Grade & Normal Grade Coatings

Epoxy Floorings - DOV® PRIME EP

DOV® EPOXY LB (Low build floor coat), DOV®EPOXY HB (High build floor coat), DOV® EPOXY SLF (Self leveling flooring). Also suited as a primer over concrete and structural steel surfaces set to receive various epoxy and polyurethane top coats.

Epoxy Floorings - DOV® EPOXY LB

Epoxy for DOV® EPOXY LB epoxy floorings A unique formulation low build epoxy coating system which produces hard chemical resistant, aesthetically pleasing colored floor coating, dust proof areas for precision assembly sections in Engineering and Electronic industries etc. The finished floor is hygienic, abrasion resistant and smooth.

Epoxy Floorings - DOV® EPOXY HB

Epoxy for DOV® EPOXY HB epoxy floorings Epoxy primer for DOV® EPOXY epoxy floorings like DOV® EPOXY LB (Low build floor coat), DOV® EPOXY HB (High build floor coat) DOV® EPOXY SLF (Self leveling flooring). Also suited as a primer over concrete and structural steel surfaces set to receive various epoxy and polyurethane top coats.

Epoxy Floorings - DOV® EPOXY SL

Epoxy for DOV® EPOXY SL epoxy floorings A solvent free Self Leveling Epoxy flooring system that is available in pleasing shades and is abrasion resistant. The finished flooring is seamless, easy to clean, and exhibits good chemical resistance. Typically suited for food processing areas of food and drink plants, pharmaceutical industries, hospitals, operation theatre’s, electrical/ electronic assembly plants, light industry and automotive showrooms.

Frequently asked questions

  • Apply one coat of Dovcoat Flex (diluted with water @ 500ml per Kg) at the rate of 10-12 m2 per liter.
  • Allow it to dry for 2-3 hours.
  • Apply the first coat of Dovcoat Flex diluted with water @ 250ml per Kg) at the rate of 2 m2 per Kg and allow it to dry before taking up the second coat, the rate of application being the same.
  • Drying time between coats will be 6 to 8 hours.
  • Ensure that the primer and the 2 coats of Dovcoat Flex totally achieve a minimum thickness of 1 mm DFT.
  • Allow the system to air cure for 7 days minimum

Cracks in concrete must be repaired as soon as possible. 

  • Waterproofing: It will solve the water-dripping problem immediately using DOV Crack filler, If the rains have already begun, get the roof waterproofed and later get the proper work done.
  • DOV Crack filler with DOV Flex waterproof coating: I personally suggest you to go for this. It takes less time and is a proper permanent and suitable method. The method includes:
  1. Cleaning of the crack surface and removing any type of oily dirt or contaminants.
  2. Widen the crack just a little to allow the grouting to occur at a faster pace.
  3. Fill the DOV crack filler in the cracked surface (or  DOV  Epoxy Injection) and seal the surfaces immediately to prevent epoxy gel from falling off. If Epoxy grouting cannot be done, you can do the same using DOV Flex with water, ONLY if the crack is shallow and not widening. When the gel dries up properly, paint the roof to give it a proper finish and to protect it from dust and water.

Hope this helps.